瞬时强降雨下铁路岩溶隧道衬砌强度探讨——以贵州织毕铁路元宝山隧道为例

余洪璋. 瞬时强降雨下铁路岩溶隧道衬砌强度探讨——以贵州织毕铁路元宝山隧道为例[J]. 中国岩溶, 2019, (6): 916-923. doi: 10.11932/karst2019y21
引用本文: 余洪璋. 瞬时强降雨下铁路岩溶隧道衬砌强度探讨——以贵州织毕铁路元宝山隧道为例[J]. 中国岩溶, 2019, (6): 916-923. doi: 10.11932/karst2019y21
YU Hongzhang. Discussion on lining strength of railway tunnels in karst areas under instantaneous heavy rainfall:An example of the Yuanbaoshan tunnel of Zhijin-Bijie railway in Guizhou Province[J]. Carsologica Sinica, 2019, (6): 916-923. doi: 10.11932/karst2019y21
Citation: YU Hongzhang. Discussion on lining strength of railway tunnels in karst areas under instantaneous heavy rainfall:An example of the Yuanbaoshan tunnel of Zhijin-Bijie railway in Guizhou Province[J]. Carsologica Sinica, 2019, (6): 916-923. doi: 10.11932/karst2019y21

瞬时强降雨下铁路岩溶隧道衬砌强度探讨——以贵州织毕铁路元宝山隧道为例

详细信息
  • 中图分类号: U451.4

Discussion on lining strength of railway tunnels in karst areas under instantaneous heavy rainfall:An example of the Yuanbaoshan tunnel of Zhijin-Bijie railway in Guizhou Province

  • 贵州是岩溶发育地区,强降雨对岩溶隧道衬砌破坏时有发生.贵州织毕铁路元宝山隧道通车前夕,瞬时强降雨致二衬多处发生挤出、跨塌、剥落、开裂、涌水、滴水等灾害,使织毕铁路开通计划被迫取消.本文借助MIDAS GTS数值模拟软件,计算并对比分析衬砌正常及施加50 m水压两种工况下,二衬位移量、轴力、弯矩及剪力情况,分析瞬时强降雨对铁路岩溶隧道衬砌强度的影响,主要结论如下:(1)在不考虑水压的情况下,二衬结构较为安全.当瞬时增加50 m水压时,因衬砌结构内力值过大,计算得出衬砌结构安全性已被破坏的结论;(2)对于地下水发育岩溶地段,若无水压的具体资料,建议Ⅲ级围岩段采用钢筋混凝土衬砌,以增加衬砌对局部瞬时水压升高的抵抗能力;(3)泄水减压是解决水头上升水压过大致使衬砌破坏的关键.