恶滩水电站围堰及4#机高边坡变形机制及加固措施研究

杨健, 秦娟, 刘风秋, 黄麟芬. 恶滩水电站围堰及4#机高边坡变形机制及加固措施研究[J]. 水文地质工程地质, 2005, (1): 16-21. doi: 10.3969/j.issn.1000-3665.2005.01.004
引用本文: 杨健, 秦娟, 刘风秋, 黄麟芬. 恶滩水电站围堰及4#机高边坡变形机制及加固措施研究[J]. 水文地质工程地质, 2005, (1): 16-21. doi: 10.3969/j.issn.1000-3665.2005.01.004
On the deformation mechanism and the reinforcement measures of cofferdam and high slope of the unit No.4 in E'tan hydropower station[J]. Hydrogeology & Engineering Geology, 2005, (1): 16-21. doi: 10.3969/j.issn.1000-3665.2005.01.004
Citation: On the deformation mechanism and the reinforcement measures of cofferdam and high slope of the unit No.4 in E'tan hydropower station[J]. Hydrogeology & Engineering Geology, 2005, (1): 16-21. doi: 10.3969/j.issn.1000-3665.2005.01.004

恶滩水电站围堰及4#机高边坡变形机制及加固措施研究

详细信息
  • 中图分类号: P642.2%TU457

On the deformation mechanism and the reinforcement measures of cofferdam and high slope of the unit No.4 in E'tan hydropower station

  • 恶滩水电站4#机基础开挖形成40m左右的高边坡,开挖过程中,边坡上部的纵向混凝土围堰不断出现横向和纵向裂缝,监测资料表明其有明显的水平和垂直位移.本文采用弹塑性有限差分数值模拟方法,对基坑开挖过程中混凝土围堰和4#机高边坡内的应力应变状态进行分析,同时结合地质资料和现场变形观测资料分析,多角度分析了边坡的变形机制.结果表明,河水位升降变化、高边坡施工开挖、F711断层揭露以及复杂的地质条件等是变形的主要影响因素,同时采用二维塑性力学上限解方法对该高边坡的稳定性进行分析,并提出采用以预应力锚索为主的边坡加固方案.监测结果表明,加固后边坡处于稳定状态.