Main Technical Methods of Casting In-situ Used in B Ramp Bridge of Tailao
计量
- 文章访问数: 204
- PDF下载数: 45
- 施引文献: 0
引用本文: | 胡善华. 太姥互通B匝道桥现浇箱主要施工技术方法[J]. 钻探工程, 2004, (9): 32-34. doi: 10.3969/j.issn.1672-7428.2004.09.011 |
Citation: | Main Technical Methods of Casting In-situ Used in B Ramp Bridge of Tailao[J]. DRILLING ENGINEERING, 2004, (9): 32-34. doi: 10.3969/j.issn.1672-7428.2004.09.011 |