Memoir of Side Slope Material Slideway Construction in Switch Station Hydropower Station Leftbank of Changhe Dam
计量
- 文章访问数: 188
- PDF下载数: 29
- 施引文献: 0
引用本文: | 谭文俊, 黄邹涛. 长河坝水电站左岸开关站边坡材料运输滑道施工实录[J]. 钻探工程, 2009, (z1): 370-372. doi: 10.3969/j.issn.1672-7428.2009.z1.088 |
Citation: | Memoir of Side Slope Material Slideway Construction in Switch Station Hydropower Station Leftbank of Changhe Dam[J]. DRILLING ENGINEERING, 2009, (z1): 370-372. doi: 10.3969/j.issn.1672-7428.2009.z1.088 |